Description
4 hangars were produced all together.
4 hangars were produced all together.
In Summer 2015 AS Maru Metall signed a contract to produce a bridge in Imatra, Finland.
The bridge has a total length of 120 meters and consists of six modules.
In spring 2016 Maru Metall AS and Maru THM OÜ signed an agreement to produce and install steel structures for a pipe bridge in Finland. The agreement covers about 95 T of manufacturing and installing steel constructions. In addition installation of wall elements, roof and windows.