Delivery and erection of steel products 171 t; Erection of SW-panels 3200 sqm; Erection of load bearing sheets 1500 sqm
The three-story 1100-space parking garage at Tallinn Airport.
Delivery and erection of steel products 171 t; Erection of SW-panels 3200 sqm; Erection of load bearing sheets 1500 sqm
The three-story 1100-space parking garage at Tallinn Airport.
Maru Metall AS signed in winter of 2017 an agreement to produce airport tram catenary stanchions for tram lines in Tallinn. A total of 50 hot dip galvanized and painted posts were produced.